top of page
IMG_9062.HEIC

Industrial Projects

Woodlea Workshop Extension

Bacchus Marsh Grammar Woodlea Campus

The existing workshop at the Bacchus Marsh Grammar Woodlea Campus has been successfully extended, providing students and staff with enhanced sports and office facilities. The expansion includes two additional bays, upgraded internal amenities, and the addition of a mezzanine and office space. Designed to complement the existing structure, the extension seamlessly integrates matching materials and architectural elements, ensuring a cohesive and functional addition to the campus.

Factory Fire Wall

Holman Industries 

The project involved the construction of a high-performance industrial fire wall to safely divide two active factories while ensuring minimal disruption to ongoing operations. Careful planning and coordination were required to maintain compliance with fire safety regulations, manage site logistics, and work around existing production schedules. The installation included fire-rated materials, structural reinforcements, and precise integration with existing building services, ensuring both safety and functionality without impacting the daily operations of the facilities.

Agricultural Shed

Bacchus Marsh Grammar Staughton Vale Campus

Design and construction of a new agricultural shed, including associated concrete works, to provide a durable and functional space for farm equipment storage and maintenance. The project involved structural design tailored to withstand rural environmental conditions, ensuring long-term durability and ease of access for machinery and daily operations.

Current Projects

Stay up to date! Follow us on social media to see our latest projects in action.

  • Facebook
  • Instagram
  • Facebook
  • Instagram
  • Linkedin

©2025 Three T Construction Group. Proudly created with Wix.com

bottom of page